Engineering Services

107 projects, sorted by category then project number

107 of 107 shown

Read-only: Writes are switched off. Set RECONCILE_WRITES_ENABLED=true once a dry run has been reviewed against a copy of the sheet.

Project #ProjectCategoryPMStatusCompletionBudgetCommitted
102408Hogan Road Drainage at S Pea Ridge {Design Only - Construction with 101874}Drainage$27,300$27,300
103195Drainage Improvements - Village WayDrainage$311,982$311,983
103253Replace Tree Grates - DowntownEquipment/Other$236,500$39,500
103465Solid Waste Road Improvements (Private Drive)Facilities$1,403,000$103,000
103512Solid Waste Complex Parking ExpansionFacilities$1,629,614$83,500
102010Georgetown Railroad Trail, Phase IB 5th Street to 31st Street {TXDOT Grant}Mobility Infrastructure$4,217,052$3,858,508
102425Lake Point Drive Extension {30% Design & ROW}Mobility Infrastructure$1,988,630$1,907,594
10289724th Street Overpass and Pedestrian ImprovementsMobility Infrastructure$7,113,199$4,686,572
102918Beyond the Bend - DPA {KDAVEO, LLC}Mobility Infrastructure$1,329,521$1,329,519
102957Midway Drive Reconstruction {30% Design Only}Mobility Infrastructure$1,125,000$974,900
102991Turn Lanes - SH 95 and Barnhardt {TxDOT AFA}Mobility Infrastructure$569,779$534,485
103478Hartrick Bluff Reconstruction, Phase 1 {30% Design Only}Mobility Infrastructure$6,000$6,000
103764Georgetown Railroad Trail, Phase II 31st Street to Leon River (Design Only & TXDOT Grant)Mobility Infrastructure$3,570,000$70,000
101607Kegley Road, Phase III & IVMultiple Types$13,934,055$13,919,043
101713N Pea Ridge, Phase IMultiple Types$8,116,901$7,916,650
101714Outer Loop West, Phase I (Tarver Drive to Riverside Trail) {TXDOT Grant}Multiple Types$33,214,722$32,998,007
101715Poison Oak, Phase I and II (Phase I Complete)Multiple Types$20,340,228$18,969,185
101802Hogan Road Developer Agreement - CSA {Kiella Development, Inc.}Multiple Types$1,275,427$1,275,426
101874South Pea Ridge RoadMultiple Types$7,143,414$7,125,286
102025Hartrick Bluff Road Reconstruction - Phase IMultiple Types$15,587,663$12,327,913
102249NPD - Avenue D Improvements {Design & ROW}Multiple Types$3,657,000$1,255,506
102296N 42nd Street ReconstructionMultiple Types$9,699,958$1,123,083
102437Blackland Ranch - CSA {Cactus Jack Developers}Multiple Types$222,520$207,681
102727Barnhardt Road Reconstruction (Interlocal Agreement with TISD)Multiple Types$10,673,920$10,668,892
103104Little River Road Widening {Design and ROW}Multiple Types$1,220,580$957,598
103123FM 93 and FM 93 Spur Road and Utilities (Near TISD Site)Multiple Types$13,540,000$1,134,693
103135Shallow Ford Road Improvements - DPA {Shallowford Road, LLC}Multiple Types$6,046,590$6,046,590
103415Northwest Little Elm Wastewater Upsizing - DPA {Seah Superalloy Technologies}Multiple Types$3,240,450$3,240,449
102627NPD - 1st Street Sidewalk (Construction with 102965)Places and Spaces$907,520$103,100
102959NPD - Nugent Ave Improvements, 3rd St to 14th St (Design Only)Places and Spaces$600,000$511,130
102964NPD - District Identification, Phase III (Las Cruces, Bird Creek, Barnhardt, NW Hills)Places and Spaces$1,215,150$221,720
1029653rd Street Miller Park Trail (Construction with 102627)Places and Spaces$850,000$182,700
102967Dog Park Near Miller Park (Construction with Nugent Ave, 102959)Places and Spaces$102,400$102,400
102979NPD - District Identification, Phase II (Midtown, Temple Heights, Jackson Park, Garden District)Places and Spaces$1,500,000$1,365,054
103220West Temple Park Trail (to Prairie View Road)Places and Spaces$3,505,250$331,440
103233NPD - 14th Street Trail and Road (Ave H to Adams Ave) {Design and ROW}Places and Spaces$1,635,600$635,600
103299Pond Dredging Miller ParkPlaces and Spaces$97,000$0
100692Rail MaintenanceReinvestment Zone No.1 Infrastructure$316,987$281,362
100693Road/Sign MaintenanceReinvestment Zone No.1 Infrastructure$328,786$0
101000North Outer Loop, Phase III (Wendland to IH35)Reinvestment Zone No.1 Infrastructure$56,885,669$56,542,307
101263Veteran's Memorial Boulevard, Phase 1 University Courtyard to Ave U {TXDOT Grant}Reinvestment Zone No.1 Infrastructure$10,832,698$10,183,344
101585Outer Loop West, Phase II (IH35 South) {Design & ROW}Reinvestment Zone No.1 Infrastructure$6,750,000$5,089,828
10216824th Street - Ave C to Central Ave {Design & ROW}Reinvestment Zone No.1 Infrastructure$538,500$443,869
1023653rd Street Bridge ImprovementsReinvestment Zone No.1 Infrastructure$5,520,000$465,216
102474Upsize Pepper Creek Trunk Sewer at Kegley Road (Design and ROW)Reinvestment Zone No.1 Infrastructure$516,100$513,937
102480McLane Pump Station and Transmission LineReinvestment Zone No.1 Infrastructure$13,752,070$477,070
102647Water Line Installation on E AdamsReinvestment Zone No.1 Infrastructure$55,000$0
102671Little Elm Wastewater Line {LE-01, SITE 40} (Project linked to 101000)Reinvestment Zone No.1 Infrastructure$370,594$337,205
102710South Temple Transmission Line A, Phase 1 (31st Street to Shallowford Road)Reinvestment Zone No.1 Infrastructure$6,413,700$4,344,083
102711South Temple Transmission Main - Line B1 (5th Street to EST) {Design and ROW}Reinvestment Zone No.1 Infrastructure$825,550$825,550
102712South Temple Ground Storage Tank & Pump Station {Design and Partial Construction}Reinvestment Zone No.1 Infrastructure$7,703,100$746,842
102741Old Howard Road Infrastructure Improvements, Phase I {Construction with project 103524}Reinvestment Zone No.1 Infrastructure$11,804,100$10,951,870
102913South Temple Transmission Main - EDA Line C from 31st St to 5th St {Blackland Capital}Reinvestment Zone No.1 Infrastructure$6,400,000$6,389,202
102916North Pepper Creek Wastewater Upsizing (Design Only)Reinvestment Zone No.1 Infrastructure$403,800$403,800
103153Avenue A Corridor, Phase I {100% Design, Phase I Construction}Reinvestment Zone No.1 Infrastructure$3,176,100$2,276,989
103154Old Howard Road Wastewater Line Extension (Construction with Project 103798)Reinvestment Zone No.1 Infrastructure$510,000$102,800
103411Friars Creek Regional Detention Pond (Construction with Project 101263)Reinvestment Zone No.1 Infrastructure$7,723,000$7,259,112
103412Veteran's Memorial Boulevard, Phase II Ave U to Ave R and Ave R to Ave OReinvestment Zone No.1 Infrastructure$16,675,000$0
103414Pepper Creek Trail RepairReinvestment Zone No.1 Infrastructure$984,900$43,900
103487South Temple Transmission Line A, Phase 2 (Along Shallowford)Reinvestment Zone No.1 Infrastructure$5,000,000$99,868
103488South Temple Transmission Line A, Phase 3 (Shallowford to IH 35) {Right-of-Way Only}Reinvestment Zone No.1 Infrastructure$600,000$120,142
103489South Temple Transmission Line A Phase 4 (IH 35 to Water Treatment Plant) {Right-of-Way Only}Reinvestment Zone No.1 Infrastructure$400,000$73,694
103490Old Howard Road to FM 1237, Phase IIReinvestment Zone No.1 Infrastructure$29,368,000$1,558,900
103493Blackland Land Swap and Roadway Connection {30% Design Only}Reinvestment Zone No.1 Infrastructure$200,000$197,400
103495Blackland Road Improvements (Highway 95 To Interstate 14) {Design Only}Reinvestment Zone No.1 Infrastructure$200,000$200,000
103524Wendland Rd Extension & Northlink Drive, Ph IIReinvestment Zone No.1 Infrastructure$7,657,535$7,136,657
103651South Temple Transmission Line B, Phase 2 (Connection to 876)Reinvestment Zone No.1 Infrastructure$700,000$60,000
103652East Outer Loop Compliance Design (Gun Club Road to Lorraine Drive)Reinvestment Zone No.1 Infrastructure$690,000$564,100
103690South Temple Transmission Line B, Phase 3 (Elevated Storage Tank to Synergy Park)Reinvestment Zone No.1 Infrastructure$1,300,000$220,000
103691South Temple Transmission Line B, Phase 1 (5th to Elevated Storage Tank)Reinvestment Zone No.1 Infrastructure$100,000$40,000
10369625th Street EST to Taylor EST 12" Waterline (Design Only)Reinvestment Zone No.1 Infrastructure$197,500$197,500
103697North Little Elm 15" Trunk Extension (WW Line LE-01)Reinvestment Zone No.1 Infrastructure$3,814,266$297,366
103779South Temple Water and Wastewater AnalysisReinvestment Zone No.1 Infrastructure$450,000$422,800
103781Crossroads Park North - Roads/Rec Fields/PlaygroundsReinvestment Zone No.1 Infrastructure$8,805,000$0
103783Doshier Farm Reclamation Plant Industrial Pre-TreatmentReinvestment Zone No.1 Infrastructure$20,750,000$0
103784Cedar Creek Drainage Basin StudyReinvestment Zone No.1 Infrastructure$8,500,000$2,363,302
103785Avenue A Corridor, Ph II - 2nd StreetReinvestment Zone No.1 Infrastructure$7,075,000$0
103786Avenue A Corridor, Phase III - Main StreetReinvestment Zone No.1 Infrastructure$5,700,000$0
103788Site 64 North ConnectorReinvestment Zone No.1 Infrastructure$3,780,000$0
103789Pepper Creek Trail LightingReinvestment Zone No.1 Infrastructure$3,165,000$0
103790SeAH Drive ExtensionReinvestment Zone No.1 Infrastructure$3,082,000$0
103791Cedar Creek Lift Station & Force MainReinvestment Zone No.1 Infrastructure$3,060,000$0
103792Travis Science Academy Improvements (S&W Park)Reinvestment Zone No.1 Infrastructure$2,875,000$0
103798Pepper Creek Drainage Channel and Old Howard WW Extension (Design with Project 103154)Reinvestment Zone No.1 Infrastructure$1,640,000$1,360,370
103799NIP Regional Detention Pond East (Little Elm)Reinvestment Zone No.1 Infrastructure$1,150,000$0
103800NIP Regional Detention Pond West (Cedar Creek)Reinvestment Zone No.1 Infrastructure$865,000$0
103801Parking Lot - Central AvenueReinvestment Zone No.1 Infrastructure$1,010,000$95,000
101081Leon River Trunk Sewer, Phase II {Design & ROW}Utilities Infrastructure$1,788,700$1,386,315
101614WTP Lagoon Improvements, Task 3B Sludge HandlingUtilities Infrastructure$8,039,630$450,377
102188Lower Knob Creek Trunk Sewer and Action World Lift Station AbandonmentUtilities Infrastructure$2,099,700$461,431
102242SH 317 & FM 2483 Wastewater ExtensionUtilities Infrastructure$1,670,369$1,619,989
102289Temple-Belton Wastewater Treatment Plant Expansion, Phase II - IFASUtilities Infrastructure$55,644,234$53,748,334
102400Northwest 36" Transmission MainUtilities Infrastructure$15,880,000$1,223,495
102472Knob Creek Trunk Sewer, Phase I {Construction Only}Utilities Infrastructure$14,263,475$13,743,427
102483SH 317 Ground Storage and Pump StationUtilities Infrastructure$7,950,000$366,350
102947West Park Elevated Storage Tank RehabilitationUtilities Infrastructure$49,500$49,500
103122West Airport Trunk Sewer, Phase I {Design}Utilities Infrastructure$169,780$169,780
103133West Airport Trunk Sewer, Phase II {Design}Utilities Infrastructure$217,141$217,140
103134West Airport Trunk Sewer, Phase III {Design}Utilities Infrastructure$199,360$199,360
103268Waters Edge Wastewater Line & Lift Station - DPA {The Ridge at Knob Creek Land Investments}Utilities Infrastructure$3,028,970$3,028,970
10343031st Street Utilities at M Wilson WayUtilities Infrastructure$253,473$253,474
103503FM 2483 Elevated Storage Tank RehabilitationUtilities Infrastructure$948,408$891,200
103701Boggy Creek Trunk Sewer, Lift Station & Force Main (Design Only)Utilities Infrastructure$809,100$809,100
1037208" Riverside Trail Water Line (Design Only)Utilities Infrastructure$64,500$64,500
103765Knob Creek Trunk Sewer, Phase III {Construction Only}Utilities Infrastructure$8,140,000$54,550
103805Utility Bore at AirportUtilities Infrastructure$263,845$260,345
103806Water Line Improvements at Cedar CreekUtilities Infrastructure$70,701$70,700