31 projects, sorted by category then project number

31 of 31 shown

Read-only: Writes are switched off. Set RECONCILE_WRITES_ENABLED=true once a dry run has been reviewed against a copy of the sheet.

Project #ProjectCategoryPMStatusCompletionBudgetCommitted
103631Membrane Rack Valve & Actuator Replacements (1 rack per year)Equipment/Other$18,043$18,042
103634Conventional Plant Valve Actuator ReplacementEquipment/Other$49,682$49,681
103635Chemical Pump ReplacementEquipment/Other$25,190$25,190
103636Spare Membrane CompressorEquipment/Other$18,642$18,642
103637Ultraviolet Optiview InstrumentEquipment/Other$16,882$16,882
102886Water Line Pipe Bursting or ReplacingUtilities Infrastructure$2,721,625$52
103090East Temple Materials Storage FacilityUtilities Infrastructure$214,905$214,903
103365Intake Traveling Screen #1Utilities Infrastructure$410,126$410,126
103371Replace Chemical PumpUtilities Infrastructure$14,578$14,577
103405Sanitary Sewer Overflow Mitigation {Environmental Protection Agency (EPA) State and Tribal Assistance Grant (STAG) Program}Utilities Infrastructure$6,250,000$6,250,000
103481SSES - Project Plans by BasinUtilities Infrastructure$1,051,795$1,041,856
103482Pipe Gallery Rehabilitation - Conventional Water Treatment PlantUtilities Infrastructure$2,500,000$68,250
103517Ave G Ground Storage - Building AssessmentUtilities Infrastructure$59,860$59,860
103530Replace Wastewater Main South 12th StreetUtilities Infrastructure$61,434$61,434
103622Upgrades to Troy Lift Station and Force MainUtilities Infrastructure$200,000$0
103623Replace Rake Drive on Clarifier #4 - CWTP Rake Drive ReplacementUtilities Infrastructure$218,880$218,880
103625Membrane Module Replacement - MWTP (1 of 3 Racks)Utilities Infrastructure$218,177$218,176
103626Raw Water Intake Aeration - WTPUtilities Infrastructure$98,970$98,970
103627Security Improvements - WTPUtilities Infrastructure$88,107$0
103628Replace Clearwell Isolation Valve - CWTPUtilities Infrastructure$80,000$80,000
103629Replace Clarifier Flock Mixers (x2) - CWTPUtilities Infrastructure$54,662$54,662
103632Plate Settler Chemical Feed Storage - CWTPUtilities Infrastructure$33,695$33,695
103633POE Monochloramine Analyzer - WTPUtilities Infrastructure$32,717$32,716
103640Manhole RehabilitationUtilities Infrastructure$176,885$176,885
103719Replace 24" Transmission MainUtilities Infrastructure$103,500$103,500
103737Reclamation Plant Backup GeneratorsUtilities Infrastructure$948,156$948,156
103739Clarifier #4 Retrofit - Water Treatment Plant (Design Only)Utilities Infrastructure$44,600$44,600
103777Pipe Bursting - Azalea DriveUtilities Infrastructure$89,320$89,320
103778Replace Chemical Water HeaterUtilities Infrastructure$24,207$24,207
103795Replace Water Pump #6 Variable Frequency DriveUtilities Infrastructure$56,000$56,000
103896Replace Modules - Membrane PlantUtilities Infrastructure$23,675$0